• Blog

Project Plan Template for PowerPoint

Simple and efficient template to help you have better control over your project planning.

PPTX

4:316:9

Free Project Plan for PowerPoint

Free project plan template for PowerPoint. Simple and efficient template to help you have better control over your project planning. Editable graphics, very easy to customize.

Project Plan Template

Comes with icons to show important achievements or a point of time in your projects (milestones).

Use this template for project management, planning, tracking, and timesheets. Track and communicate your activities (tasks or events) and progress over a 6-month time period.

Shapes are 100% editable: colors and sizes can be easily changed.

Tasks, phases and the time period can easily be adjusted according to your needs.

Includes 2 slide option designs: Standard (4:3) and Widescreen (16:9).

Widescreen (16:9) size preview:

This ‘Project Plan Template for PowerPoint’ features:

  • 2 unique slides
  • Light and Dark layout
  • Completely editable shapes
  • Uses a selection of editable PowerPoint icons
  • Standard (4:3) and Widescreen (16:9) aspect ratios
  • PPTX file

Free fonts used:

  • Helvetica (System Font)
  • Calibri (System Font)
100% Free
  • No sign-up required
  • Unlimited downloads
  • Always free

Requires attribution — Terms · license without credit

PowerPoint
4:3 · PPTX · 96.5 KB
PowerPoint
16:9 · PPTX · 94.8 KB
Aspect ratio available: 4:3, 16:9

Terms of use

Free to use, with one condition

This template is free for personal, educational, and commercial work — as long as you credit PresentationGO.

Tap any item below for the full details ↓

Keep the "Design by PresentationGO" credit on your title or closing slide, or add a visible link to presentationgo.com if you remove it.

Use it freely for school, personal projects, and non-commercial presentations.

Use it in client work, pitches, and internal business presentations.

You can't resell the template itself or republish it on another template site, edited or not.